Rooftop Solar Benefits

Get Support with Subsidy, Net Metering & EMI

We manage the complete process for rooftop solar—site survey, engineering, paperwork, **subsidy assistance**, **Net Metering**, installation, and **EMI/finance** guidance. Policies evolve over time; we’ll guide you through the current steps and documentation, so your application is smooth and compliant.

  • Submissions on your behalf via approved portals
  • DISCOM coordination for inspections & commissioning
  • Finance/EMI options with partner lenders
Subsidy and EMI assistance illustration
Eligibility (Typical)

Who can apply?

  • Residential consumer with a valid electricity connection
  • Rooftop space & sanctioned load suitable for grid-connected system
  • BIS-compliant modules & MNRE-listed inverter via registered vendor
  • System inspected & commissioned per DISCOM standards
Note: Final eligibility, kW caps, and benefits depend on the live scheme and DISCOM guidelines at the time of application.
Subsidy Overview

How subsidy typically works

  1. Apply online through the official portal & select a registered vendor.
  2. Get feasibility and proceed with installation using BIS/MNRE-compliant components.
  3. DISCOM inspection & Net Metering; then submit completion docs.
  4. After approval, subsidy is processed to the beneficiary’s bank (as per current rules).
Heads-up: Subsidy amounts and slab rules can change. We’ll brief you on the latest during our site visit.
Documents

Checklist for a smooth application

Identity & Address
  • Aadhaar / PAN (as required)
  • Recent electricity bill
  • Owner consent/Property proof
Technical Docs
  • System design/SLD
  • Module & inverter datasheets (BIS/MNRE)
  • Earthing & safety compliance
Banking
  • Cancelled cheque
  • Bank details for benefit transfer
Post-Installation
  • Work completion report
  • Inspection/commissioning certificate
  • Net Metering approval
Need help with documents?
Documents checklist visual
Finance

EMI Calculator

Savings

Simple Payback Estimator

Process

How We Get Your Subsidy & EMI Done

Step - 01
Site survey icon
Site Survey

Load study, roof & shade analysis, proposal with ROI/EMI options.

Step - 02
Paperwork icon
Paperwork

Online application, vendor selection, feasibility & approvals.

Step - 03
Install icon
Installation

BIS/MNRE-compliant EPC with safety, testing & documentation.

Step - 04
Commissioning icon
Commission & Benefit

DISCOM inspection, Net Metering, and benefit processing as per scheme.

Check Your Subsidy & EMI Options

Share your pincode and last electricity bill—we’ll size your system, guide you on subsidy, and show EMI options.

Talk to an Expert
FAQ

Subsidy & EMI — Common Questions

Is subsidy guaranteed?

Subsidy is subject to scheme availability, consumer eligibility, and successful commissioning under current rules. We will brief you on the latest status before proceeding.

Can I install first and claim later?

Most schemes require **online application and feasibility approval first**. Installing before approval can risk ineligibility—talk to us before you start.

How long does Net Metering take?

Timelines vary by DISCOM workload and documentation completeness. We coordinate inspections and keep you updated at each step.

Do you provide EMI directly?

We facilitate with partner lenders; final approval is at the lender’s discretion. Use the calculator above to get an indicative EMI.